Author: John Lux

  • Today was a long day for everyone. Movers were there early, then they were delayed because of the rain, then we just had a lot of stuff. The trucks arrived at the new building around 1pm and everything was unloaded before 5pm. Only a few casualties and only the usual...

  • I got here (old building) at 7:45am this morning and it was just me and Dennis. Within 30 minutes there were two semi trucks, a box truck and a sea of humanity from the moving company. Within the first 30 minutes I thought they would be done in an hour....

  • Today was our last full official day in our "old" building for most of us. By the end of the day if you called our new phone number (407-601-7878) you got Becci's voice, just like you would every other day. We also got our printer/copy machine taken apart and prepared...

  • Most people are at the new place today or at home since we have no phones and Internet will be disconnected at the end of the day. There's about 10 of us here and with no phones (which means no paging) it's amazing how quiet the building can be. Hopefully...

  • The old building was a flurry of activity today. Lots of people packing things. All things considered I think we're really well prepared for the move on Friday. Phones and Internet went down at the end of the day today so Dennis could take them downtown and get them set...

  • Today David, Millo, T, Robbie, Charles & Rick put together 13 workstations for the design and programming area and another 6 tables for the Story Lab. By the end of the day they were pros. The workstations look great and continue to make the design and programming, maybe, the coolest...

  • Today was actually pretty uneventful at the new building. David did a walk through with Beth from Spectra to go through the flooring to check for anything wrong. A couple minor touch up things but nothing big, besides the chunk of drywall that was damaged in the reception area but...

  • This morning David & I did a walk through of the building. Except for the carpet tiles inside the offices and edit suites on the east side of the building the flooring is done. David spent a lot of time there Friday and Saturday to make sure everything got done....

  • I think this is the first time I have posted twice in one day. I am only doing it because there has been so much progress since this morning. By the end of the day, the lobby had been stripped and prepped, the base boards were done on the west...

  • I went to the building this morning to check in on the flooring. Everything is coming together great. We did have a little drama. A portion of the building has a raised technical floor. Since most of the floor tiles are pretty old and beat up we decided to put...

  • David, Mary Anne and I had our first official client meeting at the new building today. It was pretty cool to see the reaction of a client who has spent a lot of time in the current building when he saw the new building.The painters were already there finishing the...

  • The first two webisodes were posted on the website today. I'm obviously very close to the situation but I think the videos tell a good story. We hope the next webisode will be posted tomorrow. www.ideas1stg.wpengine.com/ideasnewhomeOur cabinets were installed today and they look awesome. Just like everything else thus far,...